Glue Hill in Sturminster Newton will be closed from 18 March - 17 May 2024. The closure is to allow SGN to replace a Gas main.
SGN will publicise the road closure in a number of ways: they will place information boards on the road in this area to inform the travelling public of the works; they will carry out a letter drop to local residents directly affected by the works; and they will sign a vehicular diversion route using the local road network.
This map shows the extent of the closure and the diversion route.